The following pictures show you how Kitchen Concepts completes a kitchen remodeling project.
This is what the kitchen looked like before we started our project. |

We removed the existing appliances, tore out the tile countertop, and removed the existing cabinetry. |

We were able to tear out the floor, inspect the kitchen for dry rot, unnecessary drafts, plan the electrical, lighting, windows, sheetrock, and blueprint the cabinets and countertops. |

We filled in a recessed area with sheetrock, built the pony wall for the island, adjusted the height in the section near the sink, framed in the light box area, and had our electrical moved. |

With the electrical completed, we finished the sheetrock repair, and applied the first coat of joint compound. The heating and air ducts were relocated to accommodate the new kitchen. |

We are now done with the sheetrock. We are going to spray texture next, followed by installation of the cabinets. |

Cabinet installation commences. |

Cabinet installation complete. Decorative full height corbels will be added for a bold look, and the rest of the doors will be installed. |

The cabinetry is now complete, the flooring is the next project on the list, followed by countertops. |

Granite installed, flooring is complete. Under-cabinet lighting was installed as well. |

Tile splashes and appliances were installed, completing this kitchen.
|
|
|